![]() He said the loading areas were basically enclosed in the buildings. Murphy described the layout of the four buildings, the parking the applicant was providing and the loading areas. Access was proposed through a right in and right out driveway. The property is 1 mile from Interstate 195 and Murphy said vehicles would likely take Jackson Mills Road to County Line Road to reach the site. Neighboring uses included a single-family home, a parcel which is farmed, an automotive shop and other commercial uses. Murphy said the 37-acre site included an environmentally sensitive area that would not be disturbed during the construction of the buildings. Attorney Adam Pfeffer and engineer Brian Murphy represented the applicant at the meeting.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |